The current Openpath Jira and Confluence instances will be migrated to the MSI On-Premise solution from August 9th-11th, the current platform will be set to read-only and all future usage will be in the Avigilon Instance. Please ensure access to MSI Jira & MSI Confluence, both are accessible through OKTA. For additional information and details please refer to the Atlassian migration page

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

Backup batteries are optional, but recommended. Assuming 12VDC, the operating current of a Smart Hub ACU is 1 Amp and a Smart Reader is 0.25 Amp. To power a Smart Hub ACU and four readers, you'd need 2 Amps. And if you're powering locking hardware, you'll need to take that into consideration too. A fully loaded system (ACU, readers, and locking hardware) is about 4 Amps times the number of backup hours needed. To keep the system running for 3 hours with all entries engaged, you’d need a 12V 12Ah sealed lead acid (SLA) or gel cell battery.

Note: For a 24V power supply, you need two 12V SLA or gel cell batteries in series.

Your installer can help you determine the right backup battery for you.

  • No labels