You can set up the Single Door Controller (SDC) using the Open Alta Admin app. Open Admin The app lets you provision and troubleshoot SDCs using your mobile device. For more information, refer to How do I to use the Open Admin Alta Access app?
For iOS devices: Download on the App Store
For Android devices: Download on the Google Play Store
Info |
---|
Note: Before you can provision an SDC using the |
...
Alta Access app, you must first create an ACU in the |
...
Alta Access system. See How |
...
...
Single Door Controller Admin button:
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Setting up the SDC:
...
If powering using PoE, plug in Ethernet; if powering with an external power supply, plug in Ethernet and connect power to POWER IN
...
. The Status LED will be solid cyan
...
.
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
2. In the Alta Access app, locate the org to which
...
you're provisioning hardware, either on the list or using search, then tap on the org name
...
.
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
3. Wait until the Status LED
...
is solid blue, then press the Admin button (see above) on the SDC.
Info |
---|
Note: SDC will disconnect from the |
...
Alta Access app after 5 minutes of inactivity; press the Admin button again to reset the timer |
...
. |
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
4. When the Status LED
...
is blinking purple, in the app, tap on the last four digits of the serial number for the SDC
...
.
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
5. When the Status LED changes
...
to solid purple,
...
tap Test Internet Connection
...
and wait for a
...
green YES
...
to appear before proceeding with the next step.
Info |
---|
Note: |
...
This checks if the ACU/SDC can |
...
...
If this step fails, refer to Troubleshooting the SDC
...
. See Troubleshooting the SDC |
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
6. If the Internet connection test is successful,
...
tap Provision
...
Device in the app
...
.
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
7. Tap on the ACU Name that you want to provision to (this is the name of the SDC you created in
...
Avigilon Alta Access), then
...
tap Yes to proceed.
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
8. The Status LED will blink yellow; the app will send notifications when the SDC provision state changes
...
from Unprovisioned
...
to Provisioning in progress
...
to Provisioning complete
...
.
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
9. When setup is complete, the Status LED will change
...
to solid white.
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
...
...
If at any point the Status
...
LED blinks red, this indicates there is an issue connecting to the Internet. If attempting to set up using Wi-Fi, try switching to an Ethernet connection.
...
Refer
...
to What are the Network Requirements for
...
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
If at any point the Status LED
...
is solid red, this indicates the SDC is in an error state. Go to the Hardware Dashboard in
...
Alta Access and restart the services listed under Remote Diagnostics. If this
...
doesn't work, power cycle the SDC (remove power, wait 10 seconds, and apply power). If the error persists, contact
...
Avigilon Alta support.
Iframe | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Additional resources